Skip to main content

Modern Engineering Solutions

EPANET Water Modeling

Epanel Water Modeling

EPANET Water Modeling EPANET Water Model is a software tool that uses mathematical modeling to predict the fate and transport of pollutants, pressure within the pipe network, and predict flows. The model was developed by the EPA in response to the Clean Water Act of 1972, and has been used to evaluate water quality conditions […]