How to Conduct a Fire Flow Analysis for a Texas Development or Subdivision

Fire flow is one of the most consequential water system requirements a Texas development can face and one of the most consistently underestimated until plan review comments arrive and the site design is already locked in.
Stormwater Discharge Permitting for Industrial Facilities: TPDES Industrial Stormwater Permits Explained

An industrial facility that has never applied for a stormwater permit is not necessarily in compliance. It may simply not have been inspected yet. When stormwater contacts exposed industrial materials, equipment, process areas, or waste handling zones and then runs off the site, that discharge is regulated under the Texas Pollutant Discharge Elimination System regardless of whether anyone at the facility knows it.