Careers

Civil Drafting Automation Developer (Python), International Contractor

Remote · Contract

Posted

Why this role exists

MES designs site civil and utility plans: commercial site developments, battery energy storage sites, water and ice kiosk sites, and wastewater plants. We are building our own drafting engine in Python. It turns survey, GIS and lidar data plus an engineer's design decisions into plan sheets, and checks its own output before anyone sees it. The next step is a chat: an engineer marks up a PDF, says what they want, and the engine updates the drawing and shows the result. We need a developer to build that engine with us.

You'll be perfect for this role if:

  • You write production Python and have built tools that produce drawings, maps or geometry
  • You can read a civil plan-and-profile sheet and tell when something on it is wrong
  • You never trust output you have not checked against its source data
  • You have connected an AI model or API to a real tool, and you know where it fails
  • You write clear English and answer questions promptly during US Central business hours
  • You work on your own between check-ins and ask a precise question when something is missing

What success looks like

  • Week 1: you learn the engine's code and MES drafting standards, and merge your first change into use.
  • Week 2: you own one piece of the engine end to end, with checks that fail on bad output, and engineers use it on a live project.
  • Week 3: one sheet type goes out on a live project as the engine drew it, and the first change an engineer asked for in the chat lands on a drawing.

Key responsibilities

  • Build and maintain the Python engine: alignments, profiles, surfaces from lidar, sheet layout, labels and callouts
  • Write the checks that compare every drawing against its source data and stop a wrong sheet from going out
  • Build the tools the AI chat calls, so a marked-up PDF and an engineer's message become a tested change to the drawing
  • Keep output to MES drafting standards: layers, text styles, title blocks and sheet setup
  • Maintain exports to DXF, DWG and LandXML for people who work in CAD software
  • Flag limits and failure cases early, in writing

How we work

MES is fully remote. You work in writing through our internal project app, with a daily check-in window with the US team. Much of the engine is written with AI coding tools; you direct them and review what they produce. Every MES candidate completes a paid sample test on a real problem before any offer. For this role it is a small drawing-automation task, and part of it is proving your result is correct.

Contract terms

  • Month-to-month international contractor agreement, full-time effort expected
  • Paid through Wise or Mercury
  • No W-2 benefits

Reports to: Michael Groselle, CEO.

How to apply

Use the application form on this page. Upload one file with your resume, examples of drawing, CAD or GIS automation you built (a repository link, screenshots or a short demo video link), and a short paragraph on how you caught an error in your own tool's output. Put all three in the one file.

Requirements

Required

  • 3+ years of professional Python
  • Geometry or GIS programming: coordinate systems, polylines and surfaces, raster or lidar data
  • Experience generating or editing CAD drawings in code (DXF or DWG, any library or API)
  • Experience reading PDFs in code: annotations, vector content and page coordinates
  • Able to read civil plan sheets
  • Fluent written English
  • Reliable internet and at least 4 hours a day of overlap with US Central business hours

Preferred

  • Civil engineering, surveying or drafting background
  • AutoCAD or Civil 3D automation (.NET API or Dynamo)
  • Experience building with LLMs or AI APIs
  • Prior work for a US engineering firm

Apply

Apply for this job

Questions first? (214) 833-6748

A PDF or Word (.docx) file, up to 10 MB.

Your details and résumé go to our hiring team only. Read our privacy policy.

Careers

Working at MES

Why engineers join MES