Fate, TX
Car wash site civil design in Fate, Texas
A new car wash site in Fate, Texas got a civil plan set, a TxDOT driveway submittal and a storm design that ties into the site next door.
Read the projectSite civil and land development
We draw the site and grading plans your Texas city or county reviews, sealed by a professional engineer and coordinated with the drainage, utilities and access on the same set.
The site plan fixes where the building, parking, drive aisles and fire lanes go, with their dimensions. The grading plan sets the elevations so water runs where the drainage design sends it and the earthwork balances. Both sit in one civil set with the paving, utility, storm and erosion control sheets, so the sheets agree before a reviewer opens them.
An engineer reads your note and tells you the pathway, the agencies involved and what decides cost and schedule.
Talk to an engineerProjects
Fate, TX
A new car wash site in Fate, Texas got a civil plan set, a TxDOT driveway submittal and a storm design that ties into the site next door.
Read the project
Corinth, TX
A 2.67-acre office and retail center in Corinth, Texas, won its I-35 frontage driveway approval and was built.
Read the project
Seagoville, TX
A 2-acre shopping plaza, now built, with paving, grading, utilities, drainage and streambank stabilization designed by MES.
Read the projectTalk to an engineer
Not a salesperson. Someone who can tell you whether the pathway is real.
Your options, the agencies involved and the questions that decide cost and schedule.
No commitment to have the first call.
Prefer the phone? (214) 833-6748