Driveway and access permits and trip generation letters in Texas

We design your driveway, prepare the TxDOT, county or city permit package and any trip generation letter, and answer every round of review comments.

What this covers

  • Driveway and access permits (TxDOT, county, city) and trip generation letters
  • TxDOT access driveway permit, with spacing, sight distance and culvert sizing

Who reviews your driveway

The road decides the reviewer. TxDOT reviews any driveway onto a state highway, through its local district office, on an application from the property owner or an authorized representative. The county reviews driveways onto county roads, and the city reviews its own streets. Where a city holds TxDOT's driveway authority, TxDOT still approves the drainage impact on the highway.

A reviewer may also ask for a trip generation letter, an estimate of the traffic the site will add. It helps decide whether the site needs a turn lane or a fuller traffic impact analysis.

When you need one

  • A new driveway onto a state highway, county road or city street.
  • A road being widened next to your site, with right of way to dedicate.
  • A use large enough to draw a turn lane or deceleration lane.
  • A battery storage site whose access drive meets a state highway.

What we do

  1. Confirm who controls the frontage and what that agency asks for.
  2. Place the driveway against the spacing and sight distance rules.
  3. Size the culvert under the driveway and show it in plan and profile.
  4. Prepare the permit package, with its own site, grading and section sheets.
  5. Write the traffic piece the reviewer asks for: a trip generation letter, a parking generation letter or a traffic impact analysis.
  6. Coordinate with the city and TxDOT where both have a say, and answer comments.

A water or sewer line in state right of way is a separate TxDOT utility permit, filed by the utility that will own the line.

What you get

  • A driveway design carried into the civil set.
  • The permit package for the agency that controls the road.
  • The trip generation letter or traffic study, and written responses to review.

What affects time and cost

  • The road. A state highway driveway goes through the TxDOT district; county and city roads follow their own rules.
  • What the reviewer adds. A turn lane, a deceleration lane or a right-of-way dedication grows the scope.
  • Drainage at the road. The culvert and the ditch flow can change the design.
  • Start order. On a battery storage site, the TxDOT driveway permit is typically the longest clock we control the start of, so we start it first. Review time itself is TxDOT's.

All site civil and land development services

Start with a first answer

An engineer reads your note and tells you the pathway, the agencies involved and what decides cost and schedule.

Talk to an engineer

Projects

Work like this

Single-story brick retail building with metal awnings, a new concrete parking lot, a young tree and fresh sod.

Fate, TX

Car wash site civil design in Fate, Texas

A new car wash site in Fate, Texas got a civil plan set, a TxDOT driveway submittal and a storm design that ties into the site next door.

Read the project
Finished stone and brick commercial buildings with landscaped grounds and mature oak trees under a clear blue sky.

Corinth, TX

2.67-acre office and retail center on I-35 in Corinth, TX

A 2.67-acre office and retail center in Corinth, Texas, won its I-35 frontage driveway approval and was built.

Read the project
New concrete residential street with sidewalks and sod beside finished homes and graded lots

Lindsay, TX

48-lot subdivision with a future industrial site in Lindsay, Texas

MES planned 48 home lots and a 2.5-acre future industrial site in Lindsay, Texas, and designed the detention pond, water line extension and sewer.

Read the project

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.