Fate, TX
Car wash site civil design in Fate, Texas
A new car wash site in Fate, Texas got a civil plan set, a TxDOT driveway submittal and a storm design that ties into the site next door.
Read the projectSite civil and land development
We design your driveway, prepare the TxDOT, county or city permit package and any trip generation letter, and answer every round of review comments.
The road decides the reviewer. TxDOT reviews any driveway onto a state highway, through its local district office, on an application from the property owner or an authorized representative. The county reviews driveways onto county roads, and the city reviews its own streets. Where a city holds TxDOT's driveway authority, TxDOT still approves the drainage impact on the highway.
A reviewer may also ask for a trip generation letter, an estimate of the traffic the site will add. It helps decide whether the site needs a turn lane or a fuller traffic impact analysis.
A water or sewer line in state right of way is a separate TxDOT utility permit, filed by the utility that will own the line.
An engineer reads your note and tells you the pathway, the agencies involved and what decides cost and schedule.
Talk to an engineerProjects
Fate, TX
A new car wash site in Fate, Texas got a civil plan set, a TxDOT driveway submittal and a storm design that ties into the site next door.
Read the project
Corinth, TX
A 2.67-acre office and retail center in Corinth, Texas, won its I-35 frontage driveway approval and was built.
Read the project
Lindsay, TX
MES planned 48 home lots and a 2.5-acre future industrial site in Lindsay, Texas, and designed the detention pond, water line extension and sewer.
Read the projectTalk to an engineer
Not a salesperson. Someone who can tell you whether the pathway is real.
Your options, the agencies involved and the questions that decide cost and schedule.
No commitment to have the first call.
Prefer the phone? (214) 833-6748