Weekly Engineering Live Show
Texas Halts Data Center Permits Pending Water and Power Audits
For data center developers, and utilities and municipalities
The Weekly Engineering Live Show, recorded live on September 29, 2026. Watch the replay above.
What we covered
A data center water plan holds up when it does four things in writing. It splits demand into drinking water, cooling and process water, and fire protection. It grades every source by the evidence behind it. It closes one water balance on a daily basis. And it names who acts, and what water is left, when the main source fails.
- Quick answer
- What should the plan document actually contain?
- Why split demand into three lines?
- How do you grade the evidence behind each source?
- Which Texas rule applies to each alternative source?
- How do you close the water balance?
More episodes
Real problems, worked through live
Do you need Construction General Permit coverage before moving dirt in Texas?
For developers and builders
Watch the replay: Do you need Construction General Permit coverage before moving dirt in Texas? (YouTube, opens in a new tab)Backlog Light? Scan Your Dead CRM Deals Overnight: 600 Read, 48 Recoverable
Watch the replay: Backlog Light? Scan Your Dead CRM Deals Overnight: 600 Read, 48 Recoverable (YouTube, opens in a new tab)Your BESS development permit is approved: can you start building yet?
For battery storage developers
Watch the replay: Your BESS development permit is approved: can you start building yet? (YouTube, opens in a new tab)