Newsletter
Your Most Expensive Engineer Spends the First Hour of Every Review on Work That Doesn’t Need a License
60 of 80 minutes of a typical report review is checking, not judgment. How MES moved it off the PE's desk with 20 AI skills built from 993 real reports.
Modern Engineering Solutions
Engineer Your Freedom
The Modern PE
September 2026
Your most expensive engineer spends the first hour of every review on work that does not need a license.
The checkable half of review is where your margin quietly goes.
Watch a senior PE review a report draft. The first hour goes to checking.
Does the flow number in the executive summary match the number in the body. Are the units consistent front to back. Is the design criteria cited or only asserted. Is the required state form attached. Did somebody promise the client an outcome no engineer can guarantee and no fee ever priced. Then he finally reaches the engineering, and the judgment takes twenty minutes.
One report review, start to finish: 80 minutes
60 min
Checking
Almost none needs a stamp
20 min
Engineering
0 60 min 80 min
The first hour: number consistency, citation coverage, state forms, liability language
The judgment that needs the stamp
That first hour is the most expensive hour in your firm, and the one hour you cannot buy more of. On hourly billing you invoice it and your client wonders why review costs what it does. On lump sum you absorb it on every project, and it never shows up as a line item. It shows up as your margin.
The first hour of review is checking. The last twenty minutes are engineering.
You are paying the same rate for both, and only one of them requires the license you cannot hire.
So We Moved The Checkable Half
We moved the checkable half of review off the PE's desk. Two systems, because we deliver two things.
Reports
The review skill that drafts nothing
- Runs our pre-submittal checklist as a pass or fail rubric
- Flags phrasing against a do-not-say table built from real liability exposure
- Checks every number against every other instance of that number
- Verifies citations and shows where summary and body disagree
- Hands back a marked-up draft with the fix already written
Drawings
Plan set review against the master checklist
- Upload a plan set up to 100 megabytes
- Reviews the full set against our 14-section master checklist
- Carries about 90 field-validated QC rules from real projects
- Every arithmetic check runs in code, never in the model
- The AI finds and reads. The code does the math.
Built From Our Own Delivered Work
20
Writing skills shipped
on August 1
993
Reports read to
build the skills
14
Sections in the
master checklist
~90
Field-validated
QC rules
One skill carries our report writing standard, including the three readers every report serves at once: the client, the regulatory reviewer, and the engineer who inherits the project in nine years. Eighteen cover the report types we produce. Where a type exists in both Colorado and Texas, the skill carries separate sections, so the agent applies CDPHE or TCEQ rules without anyone remembering to say which.
The piece I care about most
Every plan review comes back with a Review Basis section at the top: pages read, extraction quality, how much text the system captured. A clean review and a degraded review can never look the same. A tripwire reads the cover sheet index against the real page count and forces a critical finding when the two disagree. A tool that returns clean on a file it could not read is worse than no tool, because now your PE trusts it.
None of this is code. Every skill and every checklist is an editable document in the platform's standards library. A senior engineer who finds a better way to structure a drainage report edits that skill at nine in the morning, and the next drainage report follows the new rule. No release, no rollout memo, no training session.
What Changes The Math On The Pod
A PE reviewing work that has already cleared two automated filters is doing a different job than the PE who is first eyes on everything. One of them carries four projects. The other is your throughput ceiling, and hiring underneath him does not move it.
Ninety QC rules your engineers learned the hard way used to live in ninety separate heads.
Now they run against every plan set before a licensed engineer opens it, and the list gets longer every time somebody catches something new.
The Test Worth Running This Week
Take one deliverable that came back marked up last week and sort the comments into two piles: comments that needed a licensed engineer's judgment, and comments a checklist would have caught. If the second pile is bigger, you are paying PE rates for proofreading and calling it quality control.
Reply and tell me the split.
I read every one.
Michael Groselle, P.E.
Founder and CEO, Modern Engineering Solutions
mod-eng.com | contact an engineer | 214-833-6748
Talk to an engineer
Tell us about your project.
An engineer reads it
Not a salesperson. Someone who can tell you whether the pathway is real.
You get a first answer
Your options, the agencies involved and the questions that decide cost and schedule.
You decide
No commitment to have the first call.
Prefer the phone? (214) 833-6748