Podcast archive

Advanced Screening Techniques for Wastewater Challenges | WEFTEC SERIES | EP8

Mark Turpin of Duperon Corporation on wastewater challenges: screening to remove solids, flushable wipes, the FlexRake IQ and simpler maintenance.

In this episode, we look at Duperon Corporation's solutions for wastewater treatment challenges, with insights from Mark Turpin. The talk runs from screening and storm flows to maintenance and regulations.

It is a resource for anyone involved in environmental management or municipal planning, or anyone who follows wastewater technology.

Guest

Mark Turpin, Duperon Corporation

In this episode

  • Duperon's screening technologies, designed to remove solids and protect downstream processes in municipal wastewater treatment.
  • Strategies for the problems caused by so-called flushable wipes, including screens that catch them before they disrupt the sewer system.
  • The FlexRake IQ and how it adjusts to changing debris loads and flow rates during peak storm events.
  • How Duperon's "less is more" design approach aims for reliable equipment that is easy to maintain and lighter on operators.
  • How Duperon works with municipalities on compliance with changing environmental regulations and standards.

Related: MES wastewater engineering in Texas.

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.