Podcast archive

Bead Filters: Low-Maintenance with Dual Biological & Mechanical Filtration | WEFTEC SERIES | EP10

Michael Malone of AST on bead filters that combine biological and mechanical filtration, plus denitrification, lagoon polishing and state approvals.

Updated · First published

In this episode, Michael Malone from Aquaculture Systems Technologies, LLC (AST) walks through filtration for both municipal and industrial uses.

The focus is bead filter technology, a low-maintenance system that does biological and mechanical filtration in one unit, and what it offers for efficiency and sustainability.

Guest

Michael Malone, Aquaculture Systems Technologies, LLC (AST)

In this episode

  • How the bead filter combines biological and mechanical filtration to remove TSS, BOD and ammonia, and even specialized contaminants like BTEX.
  • Denitrification, a hard process for many treatment plants, and AST's approach to meeting strict limits.
  • Municipalities using bead filters for lagoon polishing as an alternative to costly mechanical plant upgrades.
  • The low maintenance needs and simple operation of AST's filters, and why operators value them.
  • Malone's experience securing regulatory approval in different states, and why pilot studies matter.

Related: MES wastewater engineering in Texas.

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.