Podcast archive
Lagoon optimization with microalgae and electrocoagulation | CRWA Series, episode 5
Scott Powell of Powell Water Systems talks with Nathan Yang about pairing electrocoagulation and microalgae to treat wastewater in lagoon systems.
In this CRWA Series episode of Engineers for Communities, Nathan Yang talks with Scott Powell about solutions for lagoon systems. Scott explains how electrocoagulation and microalgae can work together in a lagoon. He also covers why these methods matter for water treatment in small municipalities.
Guest
Scott Powell joins from Powell Water Systems Inc. and Lagoon Logistics, LLC. Nathan Yang hosts.
In this episode
- Why Scott pairs electrocoagulation with microalgae in lagoons.
- How electrocoagulation forms a floc that pulls metals and solids out of the water and kills bacteria.
- How combining electrocoagulation with other settling technologies improves treatment results.
- Where state approvals stand, and how they could open the door to wider use.
- Other contaminants the technology can treat beyond lagoons.
Related episode: Electrocoagulation for small Colorado lagoons, with the Powell Water team.
Weighing options for a lagoon? See how MES handles wastewater engineering in Colorado.
Talk to an engineer
Tell us about your project
An engineer reads it
Not a salesperson. Someone who can tell you whether the pathway is real.
You get a first answer
Your options, the agencies involved and the questions that decide cost and schedule.
You decide
No commitment to have the first call.
Prefer the phone? (214) 833-6748