Podcast archive
Insights for Colorado’s water and wastewater providers | Episode 14
Sidney Innerebner of Indigo Water Group on small systems, operator shortages, PFAS, temperature limits and Colorado Regulations 85 and 31.
Running a small water or wastewater system in Colorado comes with its own set of problems. In this episode of Engineers for Communities, Sidney Innerebner talks about what providers face. The talk covers staffing, upkeep and the regulations expected in 2023.
Guest
Sidney Innerebner joins from Indigo Water Group.
In this episode
- The challenge of running small water and wastewater systems with few operators.
- Why regular maintenance and oversight matter in smaller systems.
- How regulations expected at the time of recording (2023), such as PFAS and temperature limits, could affect providers.
- How complex Colorado's nutrient rules under Regulation 85 and Regulation 31 are, and how they affect wastewater treatment plants.
- Efforts to ease the shortage of water and wastewater operators, including vocational programs.
Serving a Colorado community? See MES water and wastewater engineering in Colorado.
Talk to an engineer
Tell us about your project
An engineer reads it
Not a salesperson. Someone who can tell you whether the pathway is real.
You get a first answer
Your options, the agencies involved and the questions that decide cost and schedule.
You decide
No commitment to have the first call.
Prefer the phone? (214) 833-6748