Podcast archive

Simple Wastewater Solutions for Small Municipalities | WEFTEC SERIES | EP 12

Dave Gibson of BioWorks explains extended aeration, cold weather design and lagoon upgrades for small town wastewater, and how costs compare with MBRs.

Updated · First published

Small towns need wastewater treatment that works without a lot of complexity. In this Engineers for Communities episode, Dave Gibson from BioWorks walks through the wastewater systems his company builds for small municipalities. He covers aeration, design for cold climates, and how the costs and day-to-day operation compare with traditional methods and membrane bioreactor (MBR) systems.

Guest

Dave Gibson, BioWorks.

In this episode

  • Simpler treatment: Gibson describes the move from traditional methods to BioWorks' extended aeration systems, built for the needs of small municipalities.
  • Aeration: how BioWorks uses fine bubble diffusers and moving aeration systems to raise efficiency, cut energy costs and make maintenance easier.
  • Cold climates: how the designs keep systems from freezing through every season without costly heated enclosures.
  • Moving off a lagoon: why Gibson says operators moving from a lagoon to an activated sludge system find these systems easier to run.
  • Cost and nitrogen limits: Gibson compares cost and operating complexity with MBRs, explains how the designs can meet strict denitrification requirements, and shares examples of lagoon upgrades.

Planning a treatment upgrade for a small community? See our wastewater engineering services.

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.