Where we work

Water and wastewater engineering in Santa Rosa, California

Water and wastewater engineering for Santa Rosa projects: Regional Water Reuse System sewer connections, North Coast Water Board rules and LID stormwater.

What MES does in Santa Rosa

MES offers water engineering, wastewater engineering and site civil engineering for projects in Santa Rosa. We are licensed in California, and our California office is in San Jose.

Most Santa Rosa sites tie into city systems. The engineering work is about sewer connections, water service, stormwater and, on larger sites, recycled water.

How permitting and review work in Santa Rosa

Santa Rosa Water runs the Regional Water Reuse System, once known as the Subregional System. Its Laguna Treatment Plant treats wastewater from Santa Rosa, Rohnert Park, Sebastopol, Cotati and the South Park County Sanitation District.

Most of the plant's recycled water goes to farm and urban irrigation and to the Geysers Recharge Project, which uses it to make geothermal power.

Santa Rosa's main drinking water source is the Russian River, delivered by Sonoma Water.

The North Coast Regional Water Quality Control Board covers Santa Rosa. It issues waste discharge requirements and the area's municipal stormwater permit.

New development follows the Storm Water Low Impact Development Technical Design Manual that Santa Rosa shares with Sonoma County. Projects that need permanent stormwater measures submit a stormwater plan with their planning application.

Sites outside city limits go through Permit Sonoma, the county's planning and permit agency.

Work near Santa Rosa

We have no completed project in Santa Rosa yet. Our nearest completed California sites are in the Sacramento area, in Sacramento, Roseville and Folsom, part of a multi-state drive-up water kiosk site program.

Common questions

Who handles sewer connections in Santa Rosa?

Santa Rosa Water, the city's water and wastewater utility. Flow from the city goes to the Laguna Treatment Plant.

Which Regional Water Board covers Santa Rosa?

The North Coast Regional Water Quality Control Board. It also oversees the Phase I stormwater permit that covers Santa Rosa and Sonoma County.

Does MES have an office near Santa Rosa?

Our California office is in San Jose. Call (214) 833-6748 to talk about a Santa Rosa project, or see our California page.

Projects

Work in California

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.