
MES has finished civil site plan and city review work on 128 drive-up water kiosk sites across seven states
Drive-up water kiosk site program in seven states

Where we work
Land development engineering in New Mexico. Site civil plans, water and wastewater design, and help through city, county, NMED and EPA review.
MES helps developers and landowners in New Mexico take a site from raw land to approved plans. We handle site civil engineering, water and wastewater design, and the permits that go with them.
We start with feasibility. Can the site get water? Where will the wastewater go? What will the city or county ask for? The answers shape the rest of the design.
Then we prepare the civil site plans and take them through review.
The city reviews site plans inside its limits. Counties review subdivisions under the New Mexico Subdivision Act. State and federal rules then apply to the water, the wastewater and the stormwater.
In Las Cruces, MES prepared civil site plans for a drive-up water kiosk and took them through city review. That work was finished in May 2026. A second kiosk site, in Hobbs, is under way.
Both are part of a drive-up water kiosk program MES works on in seven states. In West Texas, MES has finished sites in Odessa and Fort Stockton and has one under way in El Paso.
Check water and wastewater first. Find out who will serve the site, or whether you will need a well and an onsite system. Then check zoning, flood zones and access. A site feasibility study answers these before you commit.
It can. EPA coverage starts at one acre of disturbance. A smaller lot that is part of a larger plan of development can need coverage too.
Yes. MES is licensed in New Mexico and takes sites across the state. Call (214) 833-6748 to talk about yours.
Projects

Drive-up water kiosk site program in seven states
Talk to an engineer
Not a salesperson. Someone who can tell you whether the pathway is real.
Your options, the agencies involved and the questions that decide cost and schedule.
No commitment to have the first call.
Prefer the phone? (214) 833-6748