Water and wastewater engineering partnership
Say yes to every water and wastewater project without hiring a full-time PE. We design lift stations, utilities and treatment plants inside your set.
Talk to an engineer or call (214) 833-6748
- You keep the client and the prime contract
- PE review before anything comes back
- 525+ projects completed
Say yes to the water and wastewater scope
Texas civil firms partner with us to deliver lift stations, water distribution systems, treatment plants and utility permitting inside their own projects. Without a partner the choices are poor: decline the work, take on unfamiliar design and risk quality problems, or hire full-time utility staff before the volume pays for them. We remove that choice. You add utility capacity when a project needs it, and carry none when it does not.
What a partnership gives you
- Full-service proposals. We provide resumes, PE credentials and project experience for the water and wastewater part of your proposal.
- Fewer surprises on unfamiliar work. Feasibility screens, infrastructure cost estimates and constructible designs for the utility scope.
- Your client stays yours. You keep the prime contract and invoice your client directly. We never contact or market to your client.
- No fixed overhead. You pay for the utility scope on projects you win, not for salaries and idle capacity.
Who we work with
Civil engineering firms
You win site development, grading and drainage work but decline projects that need water and wastewater utilities. We act as your utility department on those projects.
- Treatment plants and collection systems
- TCEQ permitting and regulatory support
- Lift stations and hydraulic modeling
- Infrastructure cost estimates
Water and wastewater firms
You have the Texas clients and the pipeline, but your PEs are buried in CAD production. We take on the production.
- Civil 3D production for utility plans
- Treatment plant design and evaluation
- Hydraulic calculations and modeling
- Master planning and capital programs
Who seals the work
You choose, and it is written down for each engagement.
- Default: we produce under your direct supervision, and you seal.
- Or: we design a discrete scope, such as a lift station or a treatment plant, and seal it ourselves. Those sheets carry our firm name and registration number, as Texas requires, and we take professional responsibility for that design and its TCEQ submittals.
We will not seal work we did not design. We will not ask you to seal work you did not supervise.
How it works
- A discovery call. 30 minutes on your Texas pipeline and whether a partnership fits. No charge.
- A fixed fee. We price the water and wastewater scope on your next project as a fixed fee for a defined deliverable, so you can build it into your bid.
- An ongoing partnership. Scale up when you win work, with no overhead in slow periods.
What we have done for other firms
Our partner program is new, so we do not publish partner case studies yet. Without names, here is the kind of work we have done inside other firms' projects:
- For a national civil firm, Austin office: engineer of record for a 0.19 MGD wastewater treatment plant, phased to 0.38 MGD, serving a residential development. Plant type selection, basis of design report, construction drawings and bidding support.
- For a Denver civil firm: lift station design for a development in Colorado, with hydraulic calculations, wet well and valve vault design, force main design, electrical and SCADA specifications, and construction documents.
- For a Colorado civil firm, working with a design-build partner: a water booster station for a 109-unit housing project, with feasibility analysis, hydraulic design with fire protection, water department coordination and construction documents.
Our own water and wastewater record: 525+ completed projects, licensed in nine states, headquartered in McKinney, Texas.
Questions firms ask
Who is responsible for the seal?
Your choice, written down per engagement. By default you supervise and seal. Or we design and seal a discrete scope, with our firm name and registration number on those sheets, and we take professional responsibility for that design.
How does pricing work?
We price most work as a fixed fee for a defined deliverable. Where the scope cannot be fixed, such as agency comments or overflow support, we quote time and materials with a budget. When you bid a project, we give you a fixed fee for the utility design (treatment plant, collection system, lift station, TCEQ permit application) so you can build it into your price.
How long does the work take?
It depends on the project and on TCEQ coordination. Typical production work (lift station design, collection system plans, hydraulic calculations) takes 2 to 4 weeks. Treatment plant design and a TCEQ permit application typically take 4 to 8 weeks to prepare; TCEQ review time is separate. We give you a realistic schedule when you bid and flag a delay before it becomes a problem.
Do you only work in Texas?
No. This page focuses on Texas, but MES is licensed in nine states: Texas, Colorado, California, Oklahoma, Nevada, Arizona, Florida, Kansas and New Mexico. Of our 525+ completed projects, 265+ are water and wastewater work.
Ready to stop declining Texas utility work?
Send us the water and wastewater scope from one live bid. We price it as a fixed fee and tell you who seals what. An engineer reads every message and gives you a first answer.
Talk to an engineer
Tell us about your project
An engineer reads it
Not a salesperson. Someone who can tell you whether the pathway is real.
You get a first answer
Your options, the agencies involved and the questions that decide cost and schedule.
You decide
No commitment to have the first call.
Prefer the phone? (214) 833-6748