Podcast archive

Cost-effective processes for wastewater from collection to treatment | WEFTEC Series 1, episode 2

Bill Snyder of Orenco Systems on cost-effective wastewater processes from collection to treatment for municipal, commercial and residential systems.

Updated · First published

Episode 2 of the Engineers for Communities WEFTEC Series features Bill Snyder from Orenco Systems, Inc.

The conversation goes deep into water and wastewater systems from collection to treatment, and looks at where Orenco's wastewater solutions fit.

Guest

Bill Snyder, Orenco Systems, Inc.

In this episode

  • Uses beyond traditional sewer systems, including residential, commercial and municipal setups.
  • How a smaller pipe diameter removes the need for deep sewer lines, which the episode ties to cost savings and easier installation.
  • Who maintains the system: depending on the setup, municipalities, developers, homeowners or homeowners' associations.
  • What developers gain: cost savings, flexibility in build-out and simpler infrastructure in the early phases of construction.
  • Passive pre-treatment that removes the need for typical headworks, and how it pairs with membrane bioreactors (MBRs) without the clogging risk of ground-up solids from grinder pumps.

Planning sewer service for a development? See MES water and sewer utility design in Texas.

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.