Podcast archive

Efficient solutions for PFAS removal | WEFTEC Series 1, episode 3

Tonya Chandler of BioLargo, Inc. talks about PFAS removal: why common treatment captures PFAS without destroying it, and where new rules may go next.

Updated · First published

In episode 3 of this Engineers for Communities series, Tonya Chandler from BioLargo, Inc. talks about ways to remove PFAS (per- and polyfluoroalkyl substances) from water.

The talk covers growing PFAS rules, why common treatment methods leave PFAS to deal with later, and where PFAS show up in daily life.

Guest

Tonya Chandler, BioLargo, Inc.

In this episode

  • PFAS face more and more rules, covering both drinking water and wastewater.
  • Activated carbon, ion exchange and membranes can remove PFAS from water, but they capture PFAS rather than destroy them.
  • BioLargo's aqueous electrostatic concentrator, which uses the polarity of PFAS to hold them on membranes and, Chandler says, leaves less waste than older methods.
  • PFAS in everyday products, such as makeup, dental floss and contact lenses.
  • Rules expected at the time of recording (2023), which reach past water to how PFAS are used in making products.

Related episode: PFAS removal using aqueous electrostatic concentrators, with BioLargo again in WEFTEC Series 2.

Read about MES water treatment design, including PFAS.

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.