Podcast archive

Grouting & Imaging Solutions in Sewer Lines and Manholes with CUES | CRWA SERIES | EP 8

Vincent Fernandez of CUES explains how grouting seals sewer pipes, manholes and laterals against inflow and infiltration, and how the Spider Cam works.

Updated · First published

In this episode of Engineers for Communities, host Nathan Yang talks with Vincent Fernandez from CUES Inc. about fixing inflow and infiltration (I&I) in aging sewer systems. They cover grouting for sewer pipes and manholes, and inspection tools like the Spider Cam that help cities manage their assets.

Guest

Vincent Fernandez, CUES Inc.

In this episode

  • How grouting seals cracks and joints in sewer pipes to stop I&I and support the pipe.
  • Manhole grouting, which injects grout around the outside of the manhole to seal leaks and keep it stable.
  • Lateral grouting, which seals leaks at service line connections, a common source of I&I.
  • The Spider Cam, which uses 360-degree imaging and stereo technology to inspect manhole walls and find structural problems.
  • How CUES supports cities and contractors with equipment, training, technical help and rentals.

Read about MES inflow and infiltration services in Colorado.

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.