Podcast archive
How inflow and infiltration affect your collection system and treatment plant | Episode 11
What inflow and infiltration (I&I) is, why it matters, how to measure it, which tests to use, and how to work the results into your sewer master plan.
Inflow and infiltration (I&I) is clean water that gets into the sewer. This episode of Engineers for Communities looks at how I&I affects a community's sewer collection system and wastewater treatment plant. It covers why I&I matters and how to address it.
In this episode
- A plain explanation of I&I and where it comes from.
- Why I&I should be on your radar, and how it affects your community.
- A quick guide to measuring I&I and judging what the numbers mean.
- A review of each testing method and what each one is best for.
- How to work the findings into your master plan, including funding options and which lines to fix first.
Planning an I&I study? See MES inflow and infiltration services in Colorado.
Talk to an engineer
Tell us about your project
An engineer reads it
Not a salesperson. Someone who can tell you whether the pathway is real.
You get a first answer
Your options, the agencies involved and the questions that decide cost and schedule.
You decide
No commitment to have the first call.
Prefer the phone? (214) 833-6748