Podcast archive
How to reduce the operating cost of reverse osmosis systems | WEFTEC Series 1, episode 1
Eric Kadaj of Energy Recovery, Inc. explains how a pressure exchanger lowers the energy use and upkeep of reverse osmosis systems. WEFTEC Series 1.
Reverse osmosis pushes seawater or brackish water through a membrane to make fresh water. A high-pressure pump powers the process. In episode 1 of the Engineers for Communities WEFTEC Series, Eric Kadaj explains how a pressure exchanger takes work off that pump and lowers the cost of running a reverse osmosis system.
Guest
Eric Kadaj, MBA, joins from Energy Recovery, Inc.
In this episode
- How a reverse osmosis system converts seawater into fresh water.
- The role of the high-pressure pump, which pushes seawater through a membrane.
- How the PX Pressure Exchanger reduces the high-pressure pump's workload to cut energy use.
- Why the device runs without electricity, driven by the brine flow.
- Upkeep and life cycle cost. Eric describes a single, durable ceramic part with no scheduled maintenance.
Planning a treatment upgrade? See MES water treatment engineering.
Talk to an engineer
Tell us about your project
An engineer reads it
Not a salesperson. Someone who can tell you whether the pathway is real.
You get a first answer
Your options, the agencies involved and the questions that decide cost and schedule.
You decide
No commitment to have the first call.
Prefer the phone? (214) 833-6748