Podcast archive

Importance of Regular Maintenance and Inspection of Water Storage Tanks | CRWA SERIES | EP 7

Robert Greenspan of Midco Diving & Marine Services on cleaning and inspecting potable water storage tanks, from concrete tanks to bolted steel tanks.

Updated · First published

In this CRWA Series episode of Engineers for Communities, Nathan Yang talks with Robert Greenspan about why potable water storage tanks need regular cleaning and inspection. Clean, sound tanks help keep a water supply safe and reliable. The talk covers both concrete and bolted steel tanks.

Guest

Robert Greenspan joins from Midco Diving & Marine Services, Inc. Nathan Yang hosts.

In this episode

  • Why a proactive maintenance schedule beats costly emergency repairs and downtime, with cleaning and inspection every three to five years.
  • How tanks can be cleaned and inspected while in service, so the system stays up and fire protection is not lost.
  • Why removing sediment matters, especially from sandy wells, to prevent wear on pumps and other parts.
  • How concrete tanks compare with bolted steel tanks on durability and upkeep.
  • A real case in Colorado where an elk collapsed a tank roof and the water was contaminated.

Planning storage or distribution work? See MES water distribution systems in Colorado.

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.