Podcast archive

Mixers, polymers and on-site chlorine generation | WEFTEC Series 1, episode 4

David Stanton of Cleanwater1 on tank mixers, polymer activation, on-site chlorine generation and sensors that help utilities meet water quality rules.

Updated · First published

Utilities have to meet strict water quality requirements, both at the treatment plant and out in the distribution network. In episode 4 of the Engineers for Communities WEFTEC Series, David Stanton talks about lower-cost ways to meet them. The talk covers mixers, polymer activation, on-site chlorine generation and sensors.

Guest

David Stanton joins from Cleanwater1.

In this episode

  • Why mixing water in the distribution network matters to keep it from going stagnant.
  • Mixers made to drop into existing water storage tanks.
  • Polymer activation (Polyblend) and how it makes better use of polymer in wastewater treatment.
  • On-site generation of sodium hypochlorite from salt, which removes the need to transport hazardous chlorine gas.
  • Optical sensors for precise water quality monitoring.

Related episode: Advanced water treatment: chlorination, flushing and real-time data, with CleanWater1 in WEFTEC Series 2.

Working on treatment or disinfection upgrades? See MES water treatment engineering.

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.