Podcast archive
Pre-engineered wastewater solutions with membrane bioreactors (MBR) | WEFTEC Series 1, episode 7
Troy Ellison of Cloacina LLC on pre-engineered membrane bioreactor (MBR) systems for municipal wastewater and how they compare with cast-in-place plants.
This WEFTEC Series episode of Engineers for Communities looks at membrane bioreactor (MBR) technology and pre-engineered wastewater solutions for municipal clients.
It compares pre-engineered MBR systems with traditional cast-in-place treatment plants.
Guest
Troy Ellison of Cloacina LLC.
In this episode
- Cloacina's focus on membrane bioreactor technology and advanced wastewater treatment for municipal clients.
- What pre-engineered MBR systems offer compared with cast-in-place plants, including cost, a streamlined design and reliability.
- How a pre-engineered approach addresses common design and construction problems at conventional wastewater treatment plants.
- The operating and maintenance benefits of above-ground MBR systems, designed for easy access.
- How these systems let more local contractors take part in construction without specialized wastewater treatment experience.
Weighing a package or pre-engineered plant in Colorado? See our package wastewater treatment plant page.
Talk to an engineer
Tell us about your project
An engineer reads it
Not a salesperson. Someone who can tell you whether the pathway is real.
You get a first answer
Your options, the agencies involved and the questions that decide cost and schedule.
You decide
No commitment to have the first call.
Prefer the phone? (214) 833-6748