Podcast archive

Water System Repairs: From Tanks to Underground Pipes | CRWA SERIES | EP 11

AJ Vela of USG Water Solutions talks with Nathan Yang about water tank maintenance, plant rehab and spray-in-place pipe repairs for utilities.

Updated · First published

In this episode, Nathan Yang hosts AJ Vela from USG Water Solutions to discuss ways to maintain and rehabilitate aging water infrastructure.

They cover how USG Water Solutions supports utilities with technology for water quality management, tank rehabilitation and pipe repairs, with the aim of better water service for municipalities.

Guest

AJ Vela, USG Water Solutions. Hosted by Nathan Yang.

In this episode

  • All-in-one water tank maintenance, including cleaning, inspections, repairs and coatings for both steel and concrete tanks.
  • Rehabilitation of aging plant infrastructure, such as filter tanks and wastewater treatment facilities.
  • Spray-in-place pipe (SIPP), a cost-effective way to repair leaks in water mains without excavation.
  • How better structural integrity and improved water flow can lower costs and extend pipe life.
  • Maintenance and rehabilitation services tailored to smaller water systems.

Planning repairs to an aging water system? See MES distribution systems services.

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.