Six single-family homes fit on a historically subdivided 0.75-acre lot, with every utility separation meeting CDPHE requirements.
Six-home infill site, Lakewood, Colorado
A 0.75-acre site in Lakewood, Colorado was historically subdivided into six smaller lots, and the plan was a single-family home on each one.
Six homes on that much land leave little room. Spacing between homes was tight, stormwater had to be managed, and every water and sewer line had to meet CDPHE separation requirements.
MES handled the full civil scope, from paving and grading through utility coordination.
MES developed detailed grading plans that kept as much usable area as possible and sent drainage away from the homes toward compliant discharge points.
MES laid out the water and sewer connections across all six lots. On lots this tight, sequencing and spacing were critical to meeting the separation rules without losing serviceability.
MES designed the paving for vehicles and pedestrians, and a stormwater design to control runoff, protect water quality and reduce flood risk to the homes and the properties around them.
MES worked with the local water and sewer providers through design and permitting, to match the connections to district standards and avoid conflicts during construction.
Every utility line separation met CDPHE requirements, and six homes fit on the 0.75 acres.
Photos from October 2022 show the homes built, with new driveways, sidewalks, curb and young street trees.
More projects

Drive-up water kiosk site program in seven states

Business park reuse after a county septic denial in Taylor, TX
Ice vending site permits across Arizona and Florida
Talk to an engineer
Not a salesperson. Someone who can tell you whether the pathway is real.
Your options, the agencies involved and the questions that decide cost and schedule.
No commitment to have the first call.
Prefer the phone? (214) 833-6748