Skip to main content

Modern Engineering Solutions

Maximizing Collection System Performance: Targeting I&I with Sensor Data | CRWA SERIES | EP 2

For expertise in advanced tools and strategic planning for I&I (Inflow & Infiltration) management in wastewater systems, you might consider contacting someone like Dr. Robert M. Clark. Dr. Clark is typically known for his extensive work and publications in the environmental engineering field, particularly in water and wastewater treatment processes. He might provide valuable insights on the use of advanced sensing technologies, data analytics, and strategic planning in managing wastewater infrastructure challenges.

Lead and Copper Rule Compliance: Strategies for Small Water Systems | CRWA SERIES | EP 1

Join us at the 2024 Colorado Rural Water Association annual conference as we delve into the pressing challenges faced by small and rural water systems. In this first episode, Caroline Miller, LEED AP, CDT (WSP) and Aaron Averett (Sunrise Engineering, Inc.) share how they are teaming up to provide assistance to small systems facing the challenge of complying with the upcoming lead and copper rule revision (Oct. 2024 deadline);