Drone view of a treatment plant under construction, with a steel roof frame over concrete basins and a reservoir beyond

Project

Morrison Creek wastewater plant, water tank and booster station

Civil design and construction observation for a new 0.35 MGD wastewater plant, plus a preliminary design for a 500,000-gallon tank.

Wastewater treatment plant under construction, Routt County, Colorado, November 2023

The problem

Morrison Creek Metropolitan Water and Sanitation District needed a new wastewater treatment plant to meet the changing needs of its Routt County, Colorado community.

Demand in the district's service area was also growing. The water system needed more storage, plus pumping and pressure control, to keep distribution reliable.

The pathway

For the new 0.35 MGD plant, MES delivered the civil site design. That covered grading, utilities, paving, stormwater drainage and cut and fill calculations for the earthwork.

The paving was designed to carry heavy vehicles and equipment across the facility.

MES then provided on-site construction observation, checking progress and quality against the design.

For the water system, MES prepared the preliminary design of a new 500,000-gallon storage tank, a booster pump station and a pressure reducing valve (PRV) system.

MES also built cost estimates for the district's budget and wrote a recommendations report on site improvements and project needs.

The result

Drone photos from January 2023 show the plant structure going up in deep snow.

By November 2023, the photos show the plant's steel roof frame over its concrete basins.

The district has a preliminary design, cost estimates and a recommendations report to carry the tank, booster station and PRV into later phases.

Plant design capacity
0.35 MGD
Civil scope
Grading, utilities, paving, drainage, earthwork
Construction
On-site observation by MES
Storage tank
500,000 gallons (preliminary design)
Also designed
Booster pump station and PRV (preliminary)
  • Wastewater treatment plant
  • Civil site design
  • Construction observation
  • Water storage and pumping

More projects

Other work like this

See all projects

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.