Finished outdoor play area with colorful rubber surfacing, boulder seating and mulched landscaping beside a building

Project

Outdoor learning area grading for Jefferson County Public Library

A 0.05-acre outdoor learning area for Jefferson County Public Library in Lakewood, Colorado, graded for safe use and opened in summer 2022.

Outdoor learning area grading, Colorado

The problem

Jefferson County Public Library was expanding the Belmar Library in Lakewood, Colorado, with a new outdoor learning area for children and families.

The space covers just 0.05 acres. It needed the right elevations and drainage so the surface would be safe for public use, and its layout and utilities had to fit the library expansion inside that small footprint.

The pathway

MES prepared detailed grading plans for the learning area. The plans set the site elevations, directed drainage and gave children and families a safe surface.

MES also designed the drainage for the new area, including a grated inlet in the play surface and a concrete swale. The team coordinated the site layout and the utility needs so the expansion worked within its 0.05-acre footprint.

The result

The outdoor learning area opened in summer 2022. It now serves children and families in the community as a safe, usable outdoor space.

Photos of the finished area show colorful rubber surfacing, boulder seating and edging, and mulch beds inside a black metal fence.

One corner holds a grated drain inlet set in the play surface, a concrete swale and a bed of river rock. Young staked trees and flagstone steppers sit in the mulch beds.

Area
0.05 acres
Opened
Summer 2022
Users
Children and families
MES scope
Grading design and civil systems
  • Site grading
  • Drainage design
  • Civil site design

More projects

Other work like this

See all projects

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.