A civil drawing set and drainage report for a cabin development in Kremmling, Colorado, revised through agency review in 2024.
Cabins on the graded site, Kremmling, Colorado
A real estate investor planned a cabin development in Kremmling, Colorado. The project needed a civil drawing set and a drainage report for agency review.
MES started work in September 2023 and visited the site that month.
The civil set covers the site plan, grading, storm sewer, a sewer network with plan and details, and a water network.
The set also has existing and proposed drainage area maps, a fire truck analysis sheet and an erosion control plan sheet.
In January 2024 MES worked on the drainage report and updated the drainage tables. A senior engineer reviewed the drawings and the set that month.
MES answered review comments from January to April 2024. The team wrote comment response letters and revised the drawings. In February it updated the layout for a new building size, and in March it updated the water network.
MES sent the first submittal to the owner in January 2024, then answered agency review comments and issued the revised set in April 2024.
The cabins are built on the graded site.
More projects

Phippsburg and Milner wastewater plants and collection system

Drive-up water kiosk site program in seven states

Replacement 10,000 gpd wastewater plant for a private school
Talk to an engineer
Not a salesperson. Someone who can tell you whether the pathway is real.
Your options, the agencies involved and the questions that decide cost and schedule.
No commitment to have the first call.
Prefer the phone? (214) 833-6748