Rebar mat on a formed deck with aluminum diamond-plate access hatches set in place, with excavated ground beyond.

Project

Replacement 10,000 gpd wastewater plant for a private school

A private school replaced its outgrown wastewater plant with a 10,000 gpd facility designed to tight effluent limits.

Deck rebar and access hatches before the concrete pour, July 2024.

The problem

A private school's wastewater treatment plant could no longer keep up with the school's growing operations or meet updated discharge requirements.

The replacement had to meet tight effluent limits: BOD of 5 mg/L, TSS of 1 mg/L and ammonia nitrogen (NH3-N) below 1 mg/L.

The pathway

MES led the civil design for a new 10,000 gallon per day plant. The team prepared the engineering plans and technical specifications.

The civil site design covered grading, drainage and utility connections.

The site plan shows a new 8-inch sewer line to the plant. The design reuses the old plant's basins as an overflow catch basin.

From February to September 2024, MES answered RFIs, reviewed shop drawings, updated the grading and drawings, and carried out a lift station review.

Site photos from July to October 2024 show the work going in: the deck rebar and access hatches, then the lift station wet well with its submersible pumps.

MES then prepared the as-built drawings, finishing them in 2025.

The result

The school has a replacement plant designed to its effluent limits.

MES supported it from design through construction, and the as-built drawings record what was built.

Design flow
10,000 gallons per day
BOD limit
5 mg/L
TSS limit
1 mg/L
NH3-N limit
Below 1 mg/L
Overflow
Old plant basins reused as an overflow catch basin
  • Wastewater treatment plant
  • Civil site design
  • Construction support

More projects

Other work like this

See all projects

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.