Project

Site master plan and phase 1 civil set for a concrete contractor

A concrete contractor has a two-phase site master plan and a phase 1 construction set for a project in Hutchins, Texas, revised to answer city review comments.

Photo from another MES project

The problem

A concrete contractor needed civil plans for a site in Hutchins, Texas.

The plans called for grading, utilities and drainage design, with pond, culvert and hydrology calculations and a level spreader.

Later the job grew into a master plan in two phases: a phase 1 construction set and a phase 2 preliminary set.

The pathway

MES started with a site plan and grading plan in October 2024, then ran storm modeling, a level spreader calculation and culvert calculations.

In January 2025 MES reworked the grading with pre-development hydrology calculations and wrote the response to review comments.

In spring 2025 MES drew a phase 2 site plan, ran the pond calculations, and updated the phase 1 construction set and its sewer lines.

The plan set covers site, paving and striping, dimension, grading, utility plan and profile, storm sewer, erosion control and drainage area maps. MES checked it against the city's requirements and development manual.

In 2026 MES updated every sheet to a new existing-ground surface, revised the culvert calculations and answered city comments with a response letter.

The result

The contractor has a master plan for the site, a phase 1 construction set and a phase 2 preliminary set. The plans were revised to answer city review comments.

The phase 1 set has answered two rounds of city comments, in January 2025 and May 2026, and the work continues.

Location
Hutchins, Texas
Phases
2 (phase 1 construction set, phase 2 preliminary set)
Drainage design
Pond, culvert and hydrology calculations, level spreader, storm modeling
Comment responses
January 2025 and May 2026
Design work
October 2024 to August 2026
  • Site master plan
  • Grading and drainage
  • Pond design
  • Construction documents

More projects

Other work like this

See all projects

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.