Septic and stormwater design for a Johnson County, Texas site

A Johnson County, Texas site got a septic design and permit package, a stormwater pond with a level spreader, and a full civil set in about six months.

Photo from another MES project

The problem

A private client needed civil plans for a site on a county road in Johnson County, Texas.

The work covered an on-site septic system and its permit package, stormwater design with a pond, and a full civil plan set.

The pathway

MES drew the preliminary site plan, then the cover, demolition, site and paving, utility and erosion control plans, and added a driveway.

For wastewater, MES estimated the septic flows and BOD loading, designed the septic system with tank drawings and details, and prepared the septic application and permit package. MES also coordinated with the Johnson County inspector.

For drainage, MES used the NRCS soil survey, delineated pre- and post-development basins and built a storm model. In May 2024, MES reworked the grading plan from scratch alongside that model.

The set went through several rounds of internal review and markups.

The design includes a pond with an outfall structure and a level spreader.

The result

The full civil set, with the septic plan, erosion control plan, details and a concrete washout, was issued in June 2024, about six months after the first site plan.

The pre- and post-development drainage maps carry the storm model reports.

County
Johnson County, Texas
Wastewater
On-site septic design and permit package
Drainage
Pond with outfall structure and level spreader; pre- and post-development storm model
Design span
December 2023 to June 2024
  • Septic design
  • Stormwater pond
  • Grading and drainage
  • Site plan

More projects

Other work like this

See all projects

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.