New single-family home with a concrete driveway and sidewalk, surrounded by bare graded lots in a new subdivision.

Project

Grading and drainage plan for a new single-family home in Texas

MES delivered the grading and drainage plans for a new single-family home in Texas, from the topographic survey to the final set.

Photo from another MES project

The problem

A private client was building a new single-family home in a residential subdivision in Texas.

The home site needed a grading and drainage plan. It was the client's second with MES in the same community, after a first plan in 2024.

The pathway

The work began with a topographic survey of the site. MES built an existing ground surface from it.

From that surface, MES drew the site plan and the grading plan, calculated the earthwork quantities and added an earthwork summary.

The drainage design included a culvert plan with profiles, and storm drainage profiles and sections.

Each plan set went to an in-house reviewer. The designers revised the sheets after every round of comments.

In January 2026 the client sent the house drawings and the foundation plan. MES then updated the grading, the site plan and the earthwork summary.

The result

MES delivered the final grading and drainage plan set in February 2026.

Site
Single-family home site in a residential subdivision
MES scope
Existing surface from the survey, site plan, grading plan, earthwork, drainage
Drainage
Culvert plan and profiles, storm profiles and sections
Design
November 2025 to February 2026
Client
Repeat client, second plan in the same community
  • Grading and drainage
  • Earthwork
  • Culvert design
  • Single-family residential

More projects

Other work like this

See all projects

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.