MES built an EPANET water model for the Town of Hayden, wrote a year-end memo with an I&I analysis, and drew RAISE grant plan sheets with quantities
Town of Hayden water model, I&I analysis and grant plans

Project
A 57,000 gpd lift station design, a CDPHE engineering report and lining plans for 35,000 feet of sewer.
Existing lift station wet well, Florissant, Colorado, May 2022
Florissant's wastewater system needed modernizing. The district needed a new influent lift station, and 35,000 feet of aging collection pipe needed rehabilitation.
Both were key to reliable wastewater service and to future growth in the area.
The work also had to meet state permitting rules and the requirements of its funding.
Site photos from May 2022 show the existing station: the wet well and its submersible pump, the control panels, the standby generator and the electric service.
MES prepared plans and technical specifications for a new 57,000 gallon per day replacement lift station.
MES wrote the engineering report for submittal to the Colorado Department of Public Health and Environment (CDPHE).
For the collection system, MES reviewed CCTV data and inspection reports to find problem areas, then prepared lining plans and specifications for the 35,000 feet of pipe.
MES also helped local officials prepare grant funding documents.
The work produced plans and specifications for the replacement lift station, an engineering report for the state submittal and grant funding documents.
The lining plans target the problem areas the CCTV review found, to rehabilitate 35,000 feet of aging pipe.
More projects

Town of Hayden water model, I&I analysis and grant plans

2.0 MGD reuse authorization for a data center and batch plant development near Martindale, Texas

1.0 MGD zero-discharge reuse for a development with industrial flows
Talk to an engineer
Not a salesperson. Someone who can tell you whether the pathway is real.
Your options, the agencies involved and the questions that decide cost and schedule.
No commitment to have the first call.
Prefer the phone? (214) 833-6748