Last Dollar PUD HOA Wastewater Treatment Improvement

Project

Last Dollar PUD HOA wastewater treatment improvement

MES provided site design, utility layout and mechanical and process drawings as a subconsultant on the Last Dollar PUD HOA wastewater treatment upgrade.

The problem

The Last Dollar PUD HOA needed to improve its wastewater treatment facilities and keep them in compliance with environmental regulations.

The pathway

MES worked as a subconsultant on the project.

MES developed the site design for the treatment facility: land use, access and the tie-ins to existing infrastructure.

MES designed the utility layout, with the water, sewer and electrical connections.

MES prepared the mechanical drawings, with the equipment, components and installation requirements for the treatment system, and helped develop the process drawings for each stage of treatment.

The result

The project team had the site design, utility layout and mechanical and process drawings for the treatment upgrade.

More projects

Other work like this

See all projects

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.