Open trench with new blue water pipe beside a mobile home, with coils of pipe on the ground

Project

Mobile home park waterline replacement in Commerce City, CO

Since the new waterline went in at a Commerce City mobile home park, residents no longer complain about water pressure.

Waterline replacement trenching in a mobile home park

The problem

A mobile home park in Commerce City, Colorado, needed its water lines replaced, and residents had complained of low water pressure. The owner needed approved plans that a contractor could build from.

The scope ran from permitting and design through agency reviews and into construction.

The pathway

Work began in September 2023. The park was surveyed by others in November 2023. Over the winter the team prepared the design documents, updated the cost estimate and answered review comments with a response letter.

In January 2024 MES met with the client. In February 2024 MES met the contractor on site, updated the cover, notes, utility and construction detail sheets, then submitted the plans.

Plan revisions continued from May to July 2024, and in August the team worked on contractor proposals. In November 2024 MES built a hydraulic model in EPANET and updated the survey and utility sheets. The plans then went through another round of city comments and revisions.

The result

The city approved the plans in December 2024, and MES delivered them to the owner. MES attended the pre-construction meeting on site in January 2025.

Construction photos show new blue water pipe laid in deep open trenches beside the homes, with an excavator working behind the spoil piles.

Construction is finished. Since the new line went in, residents no longer complain about water pressure.

Site survey
November 2023, by others
Hydraulic model
EPANET
Approved plans delivered
December 2024
Pre-construction meeting
January 2025
Construction
Finished
  • Waterline replacement
  • Hydraulic modeling
  • Agency review

More projects

Other work like this

See all projects

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.