Water treatment plant upgrades in Conifer, plus a capital improvement plan and plans for 40,000 feet of sewer and water line rehabilitation and replacement
Mountain Water and Sanitation District plant upgrades and line rehabilitation

Project
MES and the fire chief agreed on a 1,500 gpm fire flow; MES modeled the water system in EPANET and updated the fire flow memo with the results.
Photo from another MES project
A rural ranch project needed a water system that could carry fire flow as well as everyday demand.
The fire flow had to be agreed with the fire chief. The system then had to be tested in a model and written up in a memo and a report.
MES built a base demand spreadsheet and an EPANET model of the water system. It also wrote a fire flow design memo for the fire chief.
MES worked out the fire flow figures with the chief in steps. They settled on 1,500 gpm for sprinklered buildings, under Table B105.1 of the 2009 International Fire Code.
The chief also agreed that total storage could be split between the project's two water systems if they were a short drive apart. That storage still had to cover residential demand and a reserve.
MES updated the model for 8-inch mains and the 1,500 gpm fire flow. It ran the fire case at both 2-hour and 1-hour durations.
In one part of the system, model pressures ran near 120 psi. MES added another pressure reducing valve (PRV) there to hold pressure below 80 psi.
MES updated the fire flow design memo with the modeling results.
The report with exhibits went through review and a QC check before MES finished it. The work ran from July to early September 2025.
More projects

Mountain Water and Sanitation District plant upgrades and line rehabilitation

Bitter Creek Water Supply IH-20 waterline relocation

Town of Hayden water model, I&I analysis and grant plans
Talk to an engineer
Not a salesperson. Someone who can tell you whether the pathway is real.
Your options, the agencies involved and the questions that decide cost and schedule.
No commitment to have the first call.
Prefer the phone? (214) 833-6748