Inside a small water treatment building: gray PVC piping and pressure gauges on a blue steel frame beside blue treatment vessels

Project

Mountain Water and Sanitation District plant upgrades and line rehabilitation

Water treatment plant upgrades in Conifer, plus a capital improvement plan and plans for 40,000 feet of sewer and water line rehabilitation and replacement.

Piping, gauges and treatment vessels inside the water treatment plant, Conifer, Colorado, December 2020

The problem

Mountain Water and Sanitation District in Conifer, Colorado needed upgrades to its drinking water plant to meet current and future needs.

Its sewer and water lines were aging. The district needed to prioritize line replacements, quantify its water losses and identify inflow and infiltration (I&I) problems.

The pathway

At the plant, MES designed SCADA upgrades for monitoring and control, replacement booster pumps, and new filters and turbidity meters.

MES prepared the plans and specifications and provided construction oversight, working with the district and the contractors.

For the lines, MES analyzed district data to identify water losses and I&I. MES also wrote a capital improvement plan to set priorities for the upgrades.

MES supported the district with grant applications to help fund the work and ease the load on local budgets.

The line work covers the rehabilitation and replacement of 40,000 feet of sewer and water line. MES prepared the plans and specifications for it.

The result

Photos from July and December 2020 show the new turbidity analyzer giving readings in the plant's treatment building.

December 2020 photos also show a booster pump with a variable frequency drive in the same building.

The district has a capital improvement plan that ranks its sewer and water line work by priority.

Line rehabilitation and replacement
40,000 feet
Plant upgrades
SCADA, booster pumps, filters, turbidity meters
Planning
Capital improvement plan
Studies
Water loss and I&I review
Funding
Grant application support
  • Water treatment plant
  • Sewer and water line rehabilitation
  • Capital improvement plan
  • Water loss and I&I

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.