Black water pipe laid in an open red-soil trench beside a silt fence, with an excavator in the distance.

Project

10-inch waterline extension for commercial growth in Elizabeth, CO

About 4,600 feet of new 10-inch HDPE waterline supports expanding commercial and industrial development around Elizabeth, Colorado.

A similar system on another MES project

About the project

The problem

Commercial and industrial development was expanding around Elizabeth, Colorado.

A metropolitan district needed a new waterline extension to serve that growth and to add capacity for rising demand.

The pathway

MES led the design. The project covered the design and installation of about 4,600 feet of new 10-inch HDPE waterline.

MES developed the detailed design and the technical specifications for the new main, to match the district's standards and operating requirements.

MES designed the plan set. It showed the line in plan and profile, from station 1+00 to 47+00. It carried standard details for fire hydrants, valve boxes, polyethylene wrap, trace wire, concrete kickblocks, valve marker posts, and air release and vacuum relief valves.

It also covered erosion control, with silt fence, vehicle tracking control and seeding, and temporary traffic control for one-lane, two-way traffic during pipe work along the road.

During construction, MES provided ongoing engineering support. The team made site visits, reviewed contractor submittals and addressed technical issues.

The result

The district gained about 4,600 feet of new 10-inch HDPE main, designed to its standards, with the design team supporting the work in the field.

The extension gives the area reliable water service for future growth and adds capacity to meet increasing demand.

Length
About 4,600 feet (STA 1+00 to 47+00)
Pipe
10-inch HDPE
Purpose
Serve commercial and industrial growth
Design basis
District standards and operating requirements
Construction phase
Site visits and submittal review
  • Waterline extension
  • Water distribution design
  • Construction engineering

More projects

Other work like this

See all projects

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.