Skip to main content

Modern Engineering Solutions

Locally Trusted & Licensed Engineering Firm

Water And Wastewater Engineering in Austin, TX

We help developers, municipalities, and civil engineering firms across Central Texas deliver water and wastewater infrastructure faster.

Fewer TCEQ revisions, predictable costs, and permitting strategies that compress 12-month timelines to 6–8 weeks.

Wastewater sewer infrastructure network map showing trunk sewer mains, secondary collection lines, lift stations, and a central wastewater treatment plant serving a developing district.

Engineering Built for Outcomes, Not Overhead

Water and wastewater projects in the capital region fail when schedules slip, designs overreach, or permitting risks are not addressed early. We engineer with those realities in mind from day one.

Value Over
Hours

We do not bill by the hour. We price around outcomes, permits secured, schedules protected, systems sized correctly for Central Texas growth corridors and TCEQ requirements.

Speed as a Design Constraint 

Time to permit and time to water matter as much as hydraulics and code compliance. In a fast-moving development market, we treat schedule as a core design input, not an afterthought.

Deep Work, Not Meeting Culture 

Our engineers are organized for focused problem-solving, not constant meetings. Fewer handoffs and fewer revisions lead to cleaner submittals and faster TCEQ review cycles.

AI as Leverage, Not a Shortcut 

We use AI to streamline drafting and documentation so licensed Professional Engineers can focus on judgment, coordination, and quality. All technical decisions are made and reviewed by PEs.

Who We Support

We work with clients across the metro who need fast, reliable engineering without slow delivery or inflated feasibility reports.

Municipalities and Water Districts

Small and mid-sized communities across Travis, Williamson, Hays, and Bastrop counties face aging infrastructure, compliance pressures, and tight funding windows. We deliver clear recommendations sized to local budgets and aligned with TWDB and SRF funding strategies.

Developers and Industrial Owners 

Developers building along the Dessau corridor, east of I-35, and through Bastrop and Caldwell counties need fast feasibility answers, realistic costs, and a clear TCEQ path before capital is committed. We specialize in 210E reuse authorizations that cut 24-month discharge permit timelines down to 6–8 weeks.

Civil Engineering Firms

Civil firms without in-house water or wastewater capability or teams hitting PE bottlenecks during a busy development cycle, rely on us as a dependable utility partner. We handle feasibility, TCEQ submittals, and construction support so your projects stay on schedule.

What We Do

Every service is designed around constructability, permitting success, and cost control, for the specific regulatory environment developers face in Central Texas.

Wastewater Engineering

Collection systems, lift stations, treatment plants, I&I studies, and facility upgrades. One clear recommendation, realistic costs, and submittals built to move through TCEQ review with minimal revisions. Our 210E experience has saved clients 21+ months of permitting time per project.

Water Engineering

Wells, storage, distribution, and treatment systems designed around local source conditions, growth projections, and real construction budgets. We deliver feasibility clarity early so schedule delays don’t cost more than the design fees.

Civil Engineering

We handle the water and wastewater portion of civil projects so your team moves faster. Ideal for firms needing overflow support, specialized utility expertise, or PE capacity during peak demand periods.

Construction Administration

We stay engaged during construction with fast responses and clear clarifications that prevent change orders caused by ambiguity. Our engineers understand local conditions, contractor availability, and Austin Water coordination through completion.

Get Permit Solutions, Faster Timeline And Cost Estimate

Projects

From lift stations to treatment plants, MES delivers water and wastewater engineering for Austin municipalities, developers, and engineering firms - fewer revisions, faster approvals, and costs you can count on.

Blog/Newsletter

Ground-level shot of a hydrant flow test in progress at a Texas development site with gauges showing static and residual pressure evaluated by Modern Engineering Solutions.

Fire flow is one of the most consequential water system requirements a Texas development can face and one of the most consistently underestimated until plan review comments arrive and the site design is already locked in.

Why Choose Modern Engineering Solutions

  • Clear Direction

    One clear engineering path based on judgment and cost reality. No inflated reports, no option sets built to justify presentation time. Developers in high-growth corridors get definitive answers, not three alternatives and a recommendation to "study further."

  • Cost-Effective Systems

    We design systems that meet TCEQ requirements without overbuilding. Every design reflects how projects are actually constructed, operated, and maintained in Central Texas conditions, not how they look in a standard-spec manual.

  • Predictable Timelines

    Fewer submittal cycles and better coordination lead to faster approvals. Our drawings and narratives give TCEQ reviewers what they need upfront — critical as application volumes surge statewide and backlogs lengthen for unprepared submittals.

  • Senior-Level Partnership

    Direct access to experienced engineers, clear communication, and respect for project schedules, budgets, and decision-making processes. No layers of management between you and the PE doing the work.

Get in Touch!

Have a question about a specific site? Not sure if your project qualifies for a 210E authorization?

Call us or leave a message, we respond to qualified projects within a few business hours.