Arabian Acres Metropolitan District Distribution System Improvement Project

Project

Arabian Acres Metropolitan District water treatment and distribution

Two groundwater treatment plants, an elevated tank and a new pipe network designed for a disadvantaged Teller County district.

The problem

The Arabian Acres Metropolitan District serves a disadvantaged community in Teller County, Colorado. Its water treatment and distribution systems both needed significant improvements.

The district qualified for SRF loans and grants.

The pathway

MES delivered two connected projects, one for treatment and one for distribution.

For treatment, MES designed two groundwater treatment plants. Grading plans set the site elevations for plant operations and drainage.

MES coordinated the utility design so it tied into the existing systems. MES also designed the treatment processes and specified the mechanical equipment the plants need to run.

MES ran cut and fill calculations to optimize the earthwork. The facilities MES designed also included one elevated water storage tank.

For distribution, MES built a hydraulic model of the network to check flow and pressure. MES also prepared the design drawing packages for the new pipe network.

The result

The district gained designs for two groundwater treatment plants, an elevated tank and a new pipe network, covering its water system from treatment through distribution.

The drawing packages were prepared to guide construction and installation of the new pipe network.

Treatment plants
2 groundwater plants
Storage
1 elevated water storage tank
Funding
SRF loans and grants
Community
Disadvantaged community designation
Distribution
Hydraulic model and design drawing packages
  • Water treatment plant
  • Water distribution
  • Hydraulic modeling
  • Site grading

More projects

Other work like this

See all projects

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.