A wet weather sewer model, sewer and waterline plans and the collection system project manual for the City of Cripple Creek. Under construction as of October 2026.
Photo from another MES project
The City of Cripple Creek, Colorado, needed design work on its sewer collection and water distribution systems.
The sewer design needed design flows that account for the infiltration and inflow that rain adds to the pipes.
MES worked from survey notes and base files and built a model of the sewer network.
The team modeled rainfall-derived infiltration and inflow (RDII), set its parameters, worked out peak wet weather flow and determined the design flows. It also defined a sewershed for a flow monitoring study.
MES checked the model for capacity, checked manhole labels and pipe diameters, and wrote a memo and a cost estimate. The memo was finalized in April 2024.
The team reviewed the sewer and water as-built records and drew the sewer plan and profile sheets and the sanitary sewer drawings. It checked spot elevations and updated the model and drawings.
The work also took in a Cripple Creek public meeting and a site visit, both in May 2024.
In July 2024 MES made a CCTV recommendation for the collection and distribution project. Waterline drawings followed in August 2024.
The plans went to a project check set in September 2024, then through plan review and QA/QC into 2025.
In 2025 MES updated the specifications and prepared the Cripple Creek Collection System Project Manual, including its contract documents.
The work produced a sewer model with wet weather flows, a memo and cost estimate, and sewer and waterline drawings.
MES finished the collection system project manual in December 2025.
As of October 2026, the project is under construction.
More projects

Mountain Water and Sanitation District plant upgrades and line rehabilitation

Town of Hayden water model, I&I analysis and grant plans

Talk to an engineer
Not a salesperson. Someone who can tell you whether the pathway is real.
Your options, the agencies involved and the questions that decide cost and schedule.
No commitment to have the first call.
Prefer the phone? (214) 833-6748