Tracked excavator lifting a large precast concrete lift station section on chains over an open excavation

Project

RV park lift station sized for three phases in Milford, Texas

A 15,000 gallon per day lift station sized for all three phases of the RV park, with MES providing site construction services during the November 2020 install.

Lift station installation, Milford, Texas

The problem

A growing RV park in Milford, Texas, needed a wastewater lift station.

The station had to serve the full buildout of the park across all three phases of development.

The pathway

MES designed the lift station for a capacity of 15,000 gallons per day, sized for all three phases.

The team developed detailed plans and technical specifications for the station, with clear guidance for contractors.

MES coordinated with TCEQ so the design met state regulatory requirements. MES also worked with the City of Milford so the station would meet municipal requirements and tie into the city's existing wastewater system.

The result

MES provided site construction services during the install in November 2020.

Photos from early November 2020 show precast concrete wet well sections on site.

On November 11, 2020, a tracked excavator lifted a large precast section on chains over the open excavation.

MES has kept working with the park. In 2023 the team prepared as-built drawings. In 2026 it prepared a site plan set with survey, utility, grading and erosion control sheets.

Design capacity
15,000 gallons per day
Phases served
All three
Agency coordination
TCEQ and City of Milford
Wet well installation
November 2020
Construction phase
Site construction services, November 2020
Later work
As-built drawings, 2023; site plan set, 2026
  • Lift station design
  • TCEQ coordination
  • Wastewater
  • Construction services

More projects

Other work like this

See all projects

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.