Open trench and red soil spoil piles along a rural highway corridor beside a silt fence and power lines.

Where we work

Water and wastewater engineering in Brownsville, Texas

Water and wastewater engineering in Brownsville, TX: BPUB utility extensions, site civil plans and TCEQ permits for developers and Cameron County sites.

What MES does in Brownsville

MES provides water and wastewater engineering and site civil design for developers, civil engineering firms and municipalities in Brownsville and across the Rio Grande Valley. We design utility extensions, lift stations and drainage. We also prepare permit packages for sites that cannot reach a public sewer.

How permitting and review work in Brownsville

The Brownsville Public Utilities Board (BPUB) is the city's municipal utility for water, wastewater and electric service. A new development works with BPUB on its utility connection or extension.

The City of Brownsville reviews plats and site plans inside the city. For land outside city limits, confirm early whether the city or Cameron County reviews your plat. Before you design, check the Public Utility Commission of Texas map of certificated service areas (CCNs) to see which provider holds the right to serve your land.

Much of the Valley is flat, so gravity sewer lines get deep fast and lift stations are common. A site that cannot connect needs a septic permit for small flows, or a TCEQ permit or authorization for a treatment system. See your wastewater disposal options in Texas.

Work in Brownsville and the Valley

In Brownsville, MES completed work on a drive-up water kiosk site. Across the Valley, the same multi-state kiosk program has taken us to Edinburg, Hidalgo, Pharr, Weslaco and Palmview, with sites in Edinburg and Pharr still active.

Common questions

Who provides water and sewer service in Brownsville?

BPUB is the city's main water and wastewater provider. Outside its area, check the CCN map, since a water supply corporation or district may hold the service area.

What if my site cannot reach a sewer line?

The usual paths are septic for small flows, a TCEQ discharge permit, or a land application permit. Reuse under TCEQ's Chapter 210 rules is another path for some sites. Call (214) 833-6748.

Projects

Work in Texas

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.