Blog

How to move the checkable half of a PE review to software

Which first-hour review checks can move from a senior PE to software, which must stay with the PE, and how to keep the check from drifting.

For engineering firm owners: most of the checking a senior PE does in the first hour or two of a report review does not need a license. Typos, letterhead, a quantity that reads two ways, a claim with no reference and a summary that says more than the body can each be written as a rule with a yes or no answer. Software can flag those. The engineering calls stay with the PE. On the Weekly Engineering Live Show, Michael Groselle, PE, MES founder, walked through what leaves the PE’s desk, what stays on it, and the two habits that keep a software check from drifting.

Why does a report eat an hour before the real review starts?

Because the first thing on the desk is not the engineering. Reports arrive with formatting problems and typos, and the PE either spends one to two hours fixing them or sends the report back unread.

No license is needed to notice a missing letterhead or the wrong font, and that hour comes out of engineer time, which is what clients are buying. So the first question is whether a rule catches those recurring errors before the report reaches the PE at all.

The same thinking goes a layer deeper, to what the report depends on. Location, size, scope and design assumptions should read the same through the whole document, and a check should flag any one that drifts.

Which checks can leave the PE’s desk?

Any check you can write as a rule with a yes or no answer. MES runs three, each a rule first and a judgment second. Software flags; the decision under each flag stays with the PE.

  • Number consistency. The rule asks whether the same quantity reads two ways. If the report is built on 100 homes, that number reads the same everywhere. The PE decides which number is right.
  • Citation coverage. The rule asks whether every claim carries its formula, code or source, linked so the reviewer can confirm it in seconds. The PE decides whether the assumption is defensible.
  • Summary against body. The rule asks whether the summary claims more than the body backs. The PE decides whether they would seal it.

That split is what handing the checkable half of a review to software looks like in practice. The pass flags the checkable items so the PE’s read goes to the engineering.

What still has to stay with the PE?

Three questions that no rule answers: Is that design flow right for this site? Is that assumption defensible? Would I seal this?

A clean software pass is not a seal. The PE still owns the whole report and still decides whether it goes out. The engineers also keep the spreadsheet calculations; what moves into the check is the assumptions, not the engineering.

How do you hand off checking without it drifting?

Treat the tool like a teammate you check in with.

Software checks need a person to confirm them. Check in every few hours, or at least daily, especially while a long check runs 30 minutes to an hour. When someone sees something odd, the feedback updates the written standard, so the next report does not repeat it.

The second habit is the calendar. If a report is due Friday, ask for the draft Wednesday, so Thursday is for fixes and Friday is for finishing. A teammate you hand work to and never check on is not a plan, and neither is a tool.

What does an hour of PE checking cost, and where do you start?

On lump-sum work, an extra hour of senior time comes straight out of the fee. It lands in three places:

  • The firm: one more unbilled hour against a fixed fee.
  • The client: a mismatch ships when the PE skims the report late.
  • The PE: less time for proposals, mentoring, hard calls and staffing.

Start with a weekly habit. Tally the reviewer marks on a review and ask of each one: could I write this as a yes or no rule? Then move the checkable list off the PE.

Writing the standards down also pays younger staff back. An EIT can see what was checked and learn why it mattered.

Watch the full episode

Watch the episode on YouTube (opens in a new tab).

Frequently asked questions

Which report checks are safe to move off a senior PE?

The ones you can write as a yes or no rule: numbers that match throughout, a reference behind every claim, and a summary that agrees with the body.

Does a clean software pass mean the report can be sealed?

No. A pass with no flags is not a seal. The PE still owns the whole report and decides whether to seal it.

Where should a small team start?

With the checkable list. Tally each reviewer mark, ask whether it could be a yes or no rule, and move that list off the PE.

How do we get drafts earlier on lump-sum projects?

Work backwards from the due date. If a report is due Friday, ask for the draft Wednesday, so Thursday is for fixes and Friday is for finishing.

How often should someone check on a software pass?

Every few hours, or at least daily. Some checks run 30 minutes to an hour, and a tool left too long drifts.

What should the engineer still do by hand?

The spreadsheet calculations and the engineering calls. What moves into the check is the assumptions, not the design.

Is your senior PE still the first checker on every report?

We set up engineering reviews the way we set up a design: standards written down, the checkable half caught before it reaches the PE, and senior time spent on the calls that need a license. Next step: tell us how your reviews run today. An engineer reads every message and gives you a first answer.

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.