A Houston-area developer can have a wastewater treatment plant sized correctly, permitted appropriately, and budgeted realistically, and still end up relocating it midway through design...
Read MoreLift Station Design in Houston’s High Groundwater Zones: Why Standard Specs Fail in Clay-Heavy Soils
A lift station design that performs well in North Texas or the Hill Country can run into real trouble once it hits a Houston area construction site. The pumps might be identical, the wet well dimensions might match a standard detail that has worked on a dozen other …