Blog

Do you have quotes for the water tanks?

A water tank quote is a scope, not a tank price: what the site must supply, who sells the vessel, and what the engineering side has to cover.

No, not in the sense the question usually means. We are a civil engineering design firm, so we do not sell or install tanks, and we have no vessel price to hand over. A BESS water tank quote starts with a scope: the water the site must supply, where it comes from, and the approvals the tank needs.

Freshly graded bare soil beside a white tank in a snowy wooded area, with silt fence and scattered snow around the disturbed ground.
Freshly graded bare soil beside a white tank in a snowy wooded area, with silt fence and scattered snow around the disturbed ground.

Why doesn't an engineering firm quote the tank?

The tank is equipment, and the number comes from whoever sells and installs it. An engineer sizes the tank, writes the specification and gets the approvals the site needs.

“do you have quotes for the water tanks?”

A battery storage developer we spoke with

The question usually carries three scopes at once. Each one has its own sender:

  • The vessel, its coating and its erection: a tank supplier or a contractor.
  • The sizing basis, the specification, the drawings and the sealed submittal: an engineer.
  • The pad, the access drive, the fill line, the power and the drainage: site work, split between the EPC and the civil design.

One number cannot cover all three. When the request does not say which of them it means, every reply prices a different job.

We have done civil site work for a battery storage developer in Guadalupe County, Texas.

What does a tank quote actually include?

Whatever the party who sent it sells, and nothing past that line. Public tank work shows the shape, because the scope is itemized before anyone prices it.

Take a Colorado town's 2026 solicitation for potable water storage tank inspection and maintenance (opens in a new tab). It lists in-service interior and exterior cleaning, inspection, sediment removal and minor repair by a diving team. It names the standards the contractor must meet: OSHA, EPA, CDPHE, AWWA and NFPA. It also states that no additional work happens without prior authorization.

A supplier's number answers the part the supplier sells. Ask each party, in writing, where its number stops:

  • the shell, the coating and the warranty
  • delivery, setting and the crane
  • the foundation or pad, and who designs it
  • the fill line, the pump, the controls and the power
  • the access drive, for a delivery truck and for maintenance
  • the sealed submittal, where the tank serves a public water system

Why do two quotes for the same tank come back so far apart?

Because the two scopes are rarely the same job, even when the request was. Two proposals for one water system can sit far apart and both be honest, since the words “price the water tank” leave each firm to decide what it is pricing.

Our own breakdown of what a water system design quote covers makes the point: the totals differ mostly because the scopes differ. One firm reads the request as a vessel. Another reads it as the vessel, the pad, the fill line, the sealed submittal and help during construction.

Compare the item lists before the totals. Where one reply says yes and the other is silent, treat the silence as an exclusion and ask who does that work.

A foundation or a submittal does not vanish because nobody priced it. It moves to a later invoice or a change order.

What has to be settled before a supplier can price a tank?

Volume, source, refill and location. Answer those four and most of the number is decided.

  • Volume and duration. Ask your fire code official what flow the site must supply and for how long, then write the answer down. The tank size follows that answer.
  • Source. Whether a hydrant or an existing supply can deliver the water, or the site has to store all of it.
  • Refill. How the tank refills after a test or an event, and who owns that line.
  • Location. Where the tank fits inside the fenced layout, and what access a delivery truck and a maintenance crew need.
  • Approvals. What the fire review, the plat and the drainage review each need to see before the tank is real.

Change any one of those and the number moves. That is why nobody can price a tank from a street address alone.

When those answers are still open, a pre-construction site assessment is the cheaper order of work: settle what the site can support before design starts.

Put the approvals on the calendar next to the equipment order. Our briefing on why your batteries will arrive before your permits covers that order of work.

What does the engineer's side of a tank include?

The basis, the specification, the drawings, the sealed submittal and support during construction. A complete design scope names all five.

Leave one out and someone pays to fill the gap later. On water work we set out the same five parts: a hydraulic model where the system needs one, a full construction set, written specifications, a sealed regulatory submittal and construction-phase services.

Where the tank ties into a public water system in Texas, the submittal is a deliverable, not paperwork. TCEQ will not consider plans and specifications unless a licensed professional engineer directed the work and sealed, signed and dated them. Our guide to water system design quotes sets out that rule under 30 TAC §290.39.

How do you check a tank number for gaps?

Score it against a list, not against the other number. Where one reply says yes and the other is silent, you have found the difference.

  1. Is the required volume written down, with the flow and duration it came from?
  2. Does the reply say who supplies the vessel and who sets it?
  3. Is the foundation or pad inside the scope, and who designs it?
  4. Are the fill line, the pump, the controls and the power inside the scope?
  5. Is access for delivery and for maintenance inside the scope?
  6. Is the design and permitting scope listed separately, with the sealed submittal named?
  7. Does the reply list what is excluded, in writing?

Treat the number as complete only when every item is a yes. Any no, or any blank, is work you still have to place with someone, and a reason to ask before you compare totals.

Ask your engineer or project team to name, item by item, which of these sits with the supplier, which with the EPC and which with the engineer.

One note on limits: this is general education about how a tank scope is put together, not a quotation, a design, a price or an approval for your site. Fire review and permit paths follow your jurisdiction, and your engineer applies them to your site.

Frequently asked questions

Who sells the water tank for a battery storage site?

A tank supplier or a contractor, not the engineer. The engineer sizes and specifies the tank and gets the approvals around it; the supplier or contractor furnishes and sets it.

View through a car window of a fenced water facility with ground storage tanks and horizontal pressure tanks beside a rural road under a cloudy sky.
View through a car window of a fenced water facility with ground storage tanks and horizontal pressure tanks beside a rural road under a cloudy sky.

Can MES give me a tank price?

No. We are an engineering design firm, so we do not sell or install tanks. We define what the tank has to do and get the approvals around it, and a supplier or contractor prices the equipment against that.

Why do two tank quotes look so different?

Because they usually cover different work. One may price a vessel. Another may include the pad, the fill line, the submittal and help during construction. Compare the item lists first.

What should a tank quote include?

The vessel and its installation, the foundation, the fill line and controls, access, and a separate line for design and permitting. Ask for the exclusions in writing.

Do I need a permit for a water tank on a battery site?

That depends on the jurisdiction, what the tank holds and how the site is reviewed. Ask your fire official and your engineer before you buy a vessel.

When should I ask for tank quotes?

After the volume, the source and the location are settled. A number requested before those are answered usually comes back with conditions or exclusions attached.

Trying to price a water tank before the site is settled?

MES is a civil engineering design firm. We settle what the water has to do, write the specification a supplier can price, and get the fire, plat and drainage approvals around the tank.

Ask for the first step: sealed site assessment per site. What the permits will take (access, drainage, plat, fire code and water supply), the order to start them, and a low-to-high cost range (Draft report within 3 business days after the site walk). Ask for it here.

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.