Deep red-soil trench with a gate valve set at the bottom and black HDPE pipe stretched across the opening.

Where we work

Water and wastewater engineering in College Station, Texas

Water and wastewater engineering in College Station and Brazos County. Utility extensions, lift stations, treatment plants and TCEQ submittals by MES.

What MES does in College Station

MES provides water and wastewater engineering for development in College Station and across Brazos County.

We design water and sewer extensions, lift stations and force mains. Where a site cannot reach a city sewer, we design a package treatment plant and prepare the TCEQ application.

We also do site civil work, such as grading and drainage, and support projects through construction.

How permitting and review work in College Station

College Station Utilities is the city's water and wastewater utility. Lines that join the city system follow the city's design standards and plan review.

Outside the city, other utilities serve much of the land. Wellborn Special Utility District serves part of south Brazos County. The Public Utility Commission of Texas keeps the maps that show which utility holds the right to serve an area.

TCEQ sets the state design rules for public water systems and for wastewater systems. A private wastewater plant needs a TCEQ permit or other authorization.

Land outside the city limits also goes through Brazos County review. New water wells in the county fall under the Brazos Valley Groundwater Conservation District.

Work nearby

Next door in Bryan, MES prepared the civil site plans for two drive-up water kiosk sites. Both are part of a multi-site kiosk program that runs across seven states. For more Central Texas work, see our Waco and Georgetown pages.

Common questions

Who will serve my site with water and sewer?

It depends on where the land sits. Inside the city, it is usually College Station Utilities. Outside, it may be a special utility district or a water supply corporation. We check the service area maps during feasibility.

Can a site outside the city have its own wastewater plant?

It can, with a TCEQ permit or other authorization. A plant that discharges to a creek needs a TPDES permit. A site with an industrial wastewater stream may qualify for a Chapter 210 reuse authorization instead.

Do you work for cities and utilities too?

Yes. MES works for developers, utilities, cities and other engineering firms.

Projects

Work in Texas

Talk to an engineer

Tell us about your project

  1. An engineer reads it

    Not a salesperson. Someone who can tell you whether the pathway is real.

  2. You get a first answer

    Your options, the agencies involved and the questions that decide cost and schedule.

  3. You decide

    No commitment to have the first call.

Prefer the phone? (214) 833-6748

Site location, what you are trying to build, and your deadline.

Plans, a site map or photos: up to 5 files, 10 MB each.

Read our privacy policy.