A TCEQ 210E authorization in 10 weeks let a 1.0 MGD mixed-use development in San Marcos bypass a discharge permit and its hearings.
1.0 MGD zero-discharge reuse for a mixed-use development

Where we work
Water and wastewater engineering in Corpus Christi and Nueces County. Utility extensions, lift stations, treatment plants and TCEQ discharge permits.
MES provides water and wastewater engineering for development in Corpus Christi and the Coastal Bend.
We design water and sewer extensions, lift stations and force mains. For sites the city system cannot reach, we design package treatment plants and prepare the TCEQ permit application.
We also do site civil work and support projects through construction.
Corpus Christi Water runs the city's water and wastewater systems. New mains that join the city system follow its standards and go through city plan review.
A private plant that discharges needs a TPDES permit from TCEQ. TCEQ sets the permit limits to protect the water that receives the flow.
Near the coast, that water is often a coastal creek or a bay, such as Oso Creek or Oso Bay. The limits depend on that water body, so we check them before we size a plant.
Some sites can avoid a discharge. A site with an industrial wastewater stream and a workable reuse plan may qualify for a TCEQ Chapter 210 reuse authorization.
Land outside the city limits also goes through county review.
MES prepared the civil site plans for a drive-up water kiosk site in Corpus Christi. It is one site in a multi-site kiosk program that runs across seven states. Read more about our kiosk site planning.
Connect when you can. A city connection is usually simpler to permit and to run. If the nearest main is far away or full, we compare an extension with a private plant before you commit.
A site location, the planned use and the size of the development. Call (214) 833-6748 or send us a message.
Projects

1.0 MGD zero-discharge reuse for a mixed-use development

2.0 MGD wastewater reuse authorization for a mixed-use development

Industrial zero-discharge reuse in Taylor, TX, approved within 6 weeks of submission

Business park reuse after a county septic denial in Taylor, TX

Bitter Creek Water Supply IH-20 waterline relocation

Grading and drainage plan for a new single-family home in Texas
Talk to an engineer
Not a salesperson. Someone who can tell you whether the pathway is real.
Your options, the agencies involved and the questions that decide cost and schedule.
No commitment to have the first call.
Prefer the phone? (214) 833-6748