A 2.0 MGD 210E reuse authorization in 4 weeks, where nearby discharge permits took 30+ months
2.0 MGD reuse authorization for a data center and batch plant development near Martindale, Texas

Where we work
Water and wastewater engineering for New Braunfels land developers: NBU utility coordination, Edwards Aquifer rules and TCEQ-permitted private treatment.
MES designs water and wastewater systems for land developers in New Braunfels and across Comal and Guadalupe counties. We also work for utilities, cities and engineering firms.
The work covers utility coordination, water lines, sewer lines, lift stations and private treatment plants. It also covers site civil design and support during construction.
New Braunfels Utilities (NBU) provides water and sewer to most of the city. Other providers serve the edges. The Guadalupe-Blanco River Authority serves sewer south of Klein Road, and Green Valley Special Utility District serves areas southeast of the city.
Several other providers serve land outside NBU's area, such as Crystal Clear Special Utility District to the northeast. Areas with no sewer use septic or their own treatment. Check the provider before you plan a site.
Part of Comal County sits over the Edwards Aquifer. On its recharge, transition and contributing zones, TCEQ's Edwards Aquifer rules in 30 TAC Chapter 213 call for an approved plan before regulated work starts. Comal County plans go to the TCEQ San Antonio office (Region 13). See Edwards Aquifer recharge zone development.
A private plant that discharges needs a TPDES permit from the Texas Commission on Environmental Quality (TCEQ). Sites with an industrial wastewater stream may qualify for a reuse authorization under 30 TAC Chapter 210 instead. See 210E authorizations.
Close to New Braunfels, MES obtained a 1.0 MGD zero-discharge reuse authorization in San Marcos, for a development with industrial cooling and washout flows, and a 2.0 MGD reuse authorization near Martindale, for a development with a data center and a concrete batch plant. MES has also done kiosk site work in San Antonio and Leon Valley.
Check TCEQ's Edwards Aquifer map viewer. If the site is over a regulated zone, an approved plan comes before construction. Build that review into the schedule.
Most of the city is served by NBU. South of Klein Road it is GBRA, and the southeast is Green Valley SUD. Outside those areas, a site may need septic or its own plant.
Sometimes. If treated water can be reused with no discharge, a Chapter 210 authorization may fit. It depends on the flow, the waste streams and the reuse plan.
Projects

2.0 MGD reuse authorization for a data center and batch plant development near Martindale, Texas

1.0 MGD zero-discharge reuse for a development with industrial flows

Industrial zero-discharge reuse in Taylor, TX, approved within 6 weeks of submission

Business park reuse after a county septic denial in Taylor, TX

Bitter Creek Water Supply IH-20 waterline relocation

Grading and drainage plan for a new single-family home in Texas
Talk to an engineer
Not a salesperson. Someone who can tell you whether the pathway is real.
Your options, the agencies involved and the questions that decide cost and schedule.
No commitment to have the first call.
Prefer the phone? (214) 833-6748